Ecological Data for a Target project of 40 MW: - Produces the necessary energy for 12.000 – 16.000 houses;
- Prevents the release of 120 - 140 t of pollution/day - equivalent to the removal out of traffic of 9.000 – 10.000 vehicles;
- Saves the equivalent of 40 – 50 t of petroleum/day;
- Reduces greenhouse gases emissions;
- The quality of water and soil will be protected in the site location of the park by implementing building and operation technologies based on environmental protection.
|