Search

Ecological Data PDF Print E-mail

Ecological Data for a Target project of 40 MW:

  • Produces the necessary energy for 12.000 – 16.000 houses;
  • Prevents the release of 120 - 140 t of pollution/day - equivalent to the removal out of traffic of 9.000 – 10.000 vehicles;
  • Saves the equivalent of 40 – 50 t of petroleum/day;
  • Reduces greenhouse gases emissions;
  • The quality of water and soil will be protected in the site location of the park by implementing building and operation technologies based on environmental protection.
 
19 Apr 2024

Ulti Clocks content